Full Electrical Estimates
Who This Service Is For
A full electrical estimate may be appropriate when you:
Need help preparing a construction bid
Do not have enough internal estimating capacity
Want a project estimated without hiring a full-time estimator
Need quantities, labor, and costs developed together
Want an organized estimate that can be reviewed before bidding
Need field-informed scope notes, assumptions, and risk identification
This service is designed for drawing-based residential, commercial, and other agreed electrical construction projects.
What Is Reviewed
Depending on the project and accepted proposal, the review may include:
Electrical drawings and schedules
Relevant architectural and mechanical drawings
Project specifications
Addenda and issued revisions
Bid instructions and proposal requirements
Electrical service and distribution
Feeders and branch circuits
Lighting and lighting controls
Devices and equipment connections
Grounding and bonding
Raceway, conductors, boxes, fittings, and supports
Applicable demolition and renovation work
Alternate pricing and allowances
Potential scope gaps or conflicts
Relevant non-electrical documents are reviewed only as necessary to understand the electrical scope.
What Your Estimate May Include
The exact deliverables are established in your written proposal. A full estimate may include:
Electrical quantity takeoff
Labor-hour development
Material pricing and cost development
Equipment, subcontractor, or supplier quotation entries
Direct-cost summary
Scope notes and assumptions
Identified exclusions
Alternates or separate pricing
Request for Information questions
Bid-readiness review
Estimate summary
Customer-facing proposal, when specifically requested
Deliverables can be adjusted to fit the project. For example, a contractor who already has supplier quotations may need labor development and estimate organization without requiring every material price to be independently researched.
What You Must Provide
To prepare the estimate, please provide all available and relevant documents, including:
Current drawings
Project specifications
Addenda and revisions
Bid date and submission deadline
Clearly defined electrical scope
Bid form or proposal requirements
Known exclusions or special instructions
Supplier and subcontractor quotations
Preferred labor rates or labor units, if applicable
Tax, permit, bond, insurance, or prevailing-wage requirements
Any company-specific estimating standards
Missing or late information may affect the price, schedule, assumptions, and completeness of the estimate.
What Is Not Automatically Included
Unless specifically included in the accepted proposal, a full estimate does not automatically include:
Engineering or electrical system design
Sealed drawings or engineering calculations
Code-compliance certification
Permit preparation or submission
Site visits or field verification
Supplier or subcontractor procurement
Guaranteed material pricing
Guaranteed labor productivity
Guaranteed bid acceptance or project profitability
Contract or legal review
Unlimited revisions
Post-bid negotiations
Change-order estimating after the original estimate is completed
An estimate is a decision-making tool based on the documents and information available at the time. The contractor remains responsible for reviewing and approving the final bid.
Ready to Have Your Project Estimated?
Send your plans, specifications, addenda, scope information, and bid deadline. After reviewing the documents, Knecht Electrical Estimating will provide a written proposal explaining the scope, deliverables, fee, and expected completion date.